1.0. OBJECTIVE :
1.1 To lay down a procedure for the Cleaning of General capsule filling machine.
2.1 This procedure is applicable for the Cleaning of General capsule filling machine.
3.0.
RESPONSIBILITY:
3.1
Operator shall be responsible for cleaning
of General capsule filling machine.
3.2 Production Officer shall be responsible for verification of General capsule filling machine.
4.0.
ACCOUNTABILITY
:
4.1 Head of the department
5.0.
PROCEDURE :
5.1.
FULL CLEANING
(TYPE-B CLEANING)
5.1.1. Remove
“To be Cleaned” tag from equipment.
5.1.2. Remove
the residual loose powder from the exterior & interior surfaces of the
equipment with the aid of fresh dry lint free cloth or with vacuum cleaner.
5.1.3. Dismantlepowder
tray, sliding attachment plate, top main plate, sliding plate, eccentric bolt, hand
lever.
5.1.4. All
dismantle parts shall be cleaned with
running purified water.Remove adhered sticky materials by using nylon scrubber.
Use 0.5% SLS solution (If required). Scrub
manually for about 2 mins. and then rinse with running purified water for about
2 mins and shall be dried by using compressed air for about 5 mins.
5.1.5. Clean
the General capsule plates by soaking in water for 5 to 10 minutes and clean
holes using clean hard nylon brush and water.Use 0.5% SLS solution (If required). Scrub
manually for about 2 mins. and then rinse with running purified water for about
2 mins and shall be dried by using compressed air for about 5 mins.
5.1.6. Cleaning
of machine body – clean with purified water and scrub with soft nylon brush.
Rinse and thoroughlyclean with purified water.
5.1.7. All the
parts on equipment shall be arranged in reverse order of dismantling. Finally
mop the entire equipment with 70 % IPA solution.
5.1.8. The
production officer shall check equipment for cleanliness and affix ‘Cleaned’
label on equipment with filling all details in Label. Record the cleaning
activity in operation and Cleaning log of equipment.
5.2.
LIMITED
CLEANING (TYPE-A CLEANING)
5.2.1. Remove
the residual loose powder from the exterior& interior surface of the
equipment with the aid of fresh dry lint free cloth or with vacuum cleaner.
5.2.2. Clean
the floor by using vacuum cleaner.
5.2.3. Collected
powder of vacuum cleaner shall be packed in plastic bag and send to scrap yard
for further disposition.
5.2.4. The
production officer shall check equipment for cleanliness and affix ‘Cleaned’
label on equipment with filling all details in Label.Record the cleaning
activity in operation and Cleaning log of equipment.
5.3.
CLEANING
CRITERIA
FOR LIMITED CLEANING
5.3.1. For batch change over (maximum up to 10 consecutive
batches of same product or 5 days, whichever is earlier)
5.3.2. Change
over from lower strength to higher strength of the same product having same
colour.
5.3.3. If fully cleaned equipment is not used within the
prescribed time. (i.e. maximum 2 days after full cleaning).
FOR FULL CLEANING
5.3.4. For product change over
5.3.5. After 10 consecutive batches of same product or 5
days, whichever is earlier.
5.3.6. If limited cleaning is not carried out within 24 hrs
of equipment last use.
5.3.7. If equipment
is not used within 48 hrs of limited cleaning.
5.3.8. After preventive maintenance.
5.3.9. Changeover from one strength to another of the same
product with different colour.
5.3.10. Change over from higher strength to lower strength
of the same product.
Your blog is really helpful for pharma students and professionals.
ReplyDeleteBiotechnology students for Biotechnology MCQs can visit at BioTechBug.
Free Online MCQs on Biotechnology
Free Online MCQs on Analytical Techniques
Free Online MCQs on Animal Biotechnology
Free Online MCQs on Biochemical Engineering
Free Online MCQs on Biochemistry
Free Online MCQs on Biomedical Engineering
Free Online MCQs on Bioprocess Engineering
Free Online MCQs on Cell Biology
Spine tumor treatment is always complicated and painful, but if done in the right way it can be effective and have few side effects. We provide you with tips and tricks to treat spine tumors. Consult Dr. Vikas Kathuria for the Best Treatment of Spine Tumor
ReplyDelete